Contact us anytime on our 24hr Service number:

01359 25 11 80

A well known Agricultural Equipment Manufacturer in Suffolk built a factory extension to house their New Spray Booths and Shot Blasting Facility.

Compressed air was needed from the two existing main Atlas Copco Air Compressors into and around the new Facility

Air Power East installed a new 63mm AirNet feed to the building and completed the new ring main system in 50mm to the main shot blasting Receivers and a 40mm around the rest of the building with various 25mm take off points

‘The airline is supplying the blast room with plenty of air as required and it is dry, you have delivered what we required on time and provided a excellent service, we are pleased with the work and how it was carried out.’ A W